Skip to main content
Home » Jeep Electrical » Batteries & Charging » Battery Wiring & Regulators » Painless Wiring Performance 250 AMP Dual Battery Control System

Painless Wiring 40102 Performance 250 AMP Dual Battery Control System

Quadratec Part #: 17004-200
Painless Wiring Part #: 40102
Description
Painless Wirings 250 amp dual battery controller includes a three position switch to control the second battery through the operation of the solenoid. Switch position one isolates the second battery. Position two connects the battery while the ignition is on. Position three connects the second battery at all times.
Details

Painless Wirings 250 amp dual battery controller includes a three position switch to control the second battery through the operation of the solenoid. Switch position one isolates the second battery. Position two connects the battery while the ignition is on. Position three connects the second battery at all times.For applications in which the system may be exposed to the elements, such as marine, use Painless Performance 250 AMP Waterproof / Sealed Dual Battery Control System

Installation Notes
Installation Difficulty:
Skill Level 2 IconLevel 2Intermediate

Mechanics Tools
Some Drilling May be Required to Mount Switch

Installation Time: 1-3 hours
Parts Included

Solenoid
In Cab Switch
Wire Harness
Fuse with Holder
Wire Loom
Installation Hardware

  • Shipping Weight: 3.4lb
  • Shipping Dimensions: 13in x 7in x 5in (L x W x H)
Share Your Thoughts
Review Summary
Shared Media
Questions

Customer Submitted Photos

Painless Wiring Performance 250 AMP Dual Battery Control System Reviews